MAIN FEATURES
Designed for characterization of fuel
assemblies (FA) PWR
Independent robust system with capacity
to support FA
Specific design to work underwater in a
radioactive environment
Frame with 12 LVDT (displacement linear
transformers) arranged 360º around the FA
High radiation tolerant cameras for
dimensional inspections support
PERFORMING
Acquisition time of about 10 minutes per FA
Visual identification of FA
Performing calibration with a reference a
dimensional block and FA dummy
Quick set-up for acquisition
Automatic and configurable report after
acquisition
SICOMDIM
®
Dimensional Characterization of PWR Fuel Assemblies